- Paint and Primer in one
- High Bond Latex Technology
- Algal and Fungal Resistance
Good to see you!
Or by email
Welcome to Dulux
Or by email
Terms and Conditions
Thanks for registering
We will sent you colourful news every now and then
Registration complete
Forgotten your password?
Please enter email address associated to your account
Password changed successfully
We successfully updated your personal details.
Forgotten your password?
Would you spare a minute to answer 3 questions
Thanks for registering
We will send you colourful news every now and then
Delete Account
Dulux Weathershield Tile
-
Finish Mid Sheen
-
Coverage 4.6-6.5 sqm/L
-
Drying Time 4-6 Hours
-
Coats 2
-
Water Beading Effect
-
Microbond Latex Film
-
Fungal Guard
-
Colour Lock Technology
Product Description
Application Description
Ensure surface is thoroughly clean, dry and free from all loose dirt, chalk, grease, fungi, algae and flaking paint. This can be achieved by brushing with a wire/stiff coir brush, followed by water jetting if required. Use Dulux Aquatech Pre Treatment Coat to ensure that algae and fungi are removed from the roots.
Step 2 : Application process
Dilute 1 liter of the paint with 300-400 ml of clean water for solid shades. In case of deep colours, dilute with maximum of 250 ml of water to 1liter paint. No Dilution is recommended for Clear and Metallic shades. Stir thoroughly before use. Apply 2-3 coats with an intermittent drying time of 4-6 hours
Step 3 : Drying time
Touch dry for the paint is up to 1 hour and allow 4-6 hours of drying time for recoating
Health & Safety
Tips & Advice
-
1. Preparing the SurfacesEnsure surface is thoroughly clean, dry and free from all loose dirt, chalk, grease, fungi, algae and flaking paint.
-
2. CleaningClean all epquipment with clean water immediately after use.
How much paint do I need?
More than one wall to paint? Try our advanced paint calculator
Measure the height and length of the surface you want to paint (in metres or centimetres).
Your Measurements:
{{!-- This value will be injected with JavaScript --}}
Amount needed:
{{!-- This value will be injected with JavaScript --}}
This is an estimated based on 2 coats. Actual coverage will depend on the conditions of the surface. If the colour change is strong, more coats may be required.